Spring 2027 Student Internship - Engineering, Plant City Distribution Design
TecoenergyPlant City · Posted Sep 22
Location: Plant City, Flor, US
Title: TECO Spring 2027 Engineering Internship - Plant City Distribution Design
Company: Tampa Electric Company
State and City: Florida - Plant City
Shift: Unknown
Where Your Education Meets Opportunity
Are you a college student ready to gain real-world experience in your field of study? The TECO Energy Student Program is your opportunity to apply classroom knowledge in a professional setting, contribute to meaningful projects, and grow your career from day one.
We partner with accredited four-year colleges and universities to recruit motivated students who are eager to learn and make an impact. As a student with us, you’ll take on challenging assignments that align with your academic background and our business needs—giving you a head start on your future.
Why Join Us?
Hands-on experience in your area of study
Meaningful, project-based work
Professional development and mentorship
A supportive, inclusive work environment
Start building your future with TECO Energy.
Position Summary/Details:
This position is responsible for the coordination and design of Tampa Electric Company’s (TEC) distribution system, including new construction and maintenance projects. This position will establish relationships with customers and local agencies to determine the requirements for providing service. The Engineer will generate and manage projects using TEC tools, and create the necessary permit and construction drawings. The Engineer will be responsible for the successful coordination of the project with TEC departments to completion.
Key Responsibilities and/or Learning Objectives
1. Meet with customers and/or their agents (Customers) to conduct needs and feasibility assessments
on multiple construction projects and load additions of varying scale. Manage the schedule and
required completion dates of different construction phases.
▪ Manage communication to all involved entities concerning any updates in the construction
schedule or other changes with potential impact, documenting updates through letters and
emails, as necessary.
▪ Coordinate and manage the construction activities between TEC Planning & Scheduling, Field
Construction, Operations, the Customer, and any other ED Departments.
▪ Represent customers in weekly POW meetings with all involved TEC departments.
2. Create and manage work requests (WR) in the Work Management System (WMS). Divide jobs into
phases/crews, establishing an associated WR for each of the different TEC construction
phases/crews involved: including overhead line crews, underground line crews, service crews,
grounding contractors, project conduits, and crossing conduits. Enter and continually update
targeted schedule dates, work status, and other project details in WMS for all associated WRs.
3. Perform analysis to determine the most economical and reliable solutions for customers and the
TEC distribution system.
▪ Calculate and analyze customer load for proper sizing of TEC facilities
▪ Design and determine TEC facility locations
▪ Design to NESC and TEC specifications, providing pole loading analysis, cable pulling
calculations, ruling span calculations, clearances, motor start calculations, voltage drop, and
sag calculations.
▪ Adhere to Florida Administrative Code (Tariff)
4. Using TEC’s geographical information system (GIS), design the proposed and update existing
electrical features (company assets). Establish all specifications in GIS, such as the correct
electrical connectivity, proper supporting structures, and all compatible units (CU) for materials
and labor. Resolve any identified errors in GIS, ensure all GIS task types are linked to the WMS WRs,
and export GIS material data to WMS.
5. Produce and/or oversee the production of construction prints for Field Construction, Operations,
and/or contractors:
▪ Verify and approve that locations of TEC’s existing and proposed equipment and any third
party infrastructure (water, sewer, storm, gas, telephone, and cable lines) are adequately
identified on the construction prints, and equipment specifications are captured.
▪ Based on the scope of construction and company safety standards, determine necessity and
scale of Maintenance of Traffic (MOT) plan that Field Construction, Operations, and/or
contractors would need for completing work in the right-of-way.
▪ Prepare GIS prints to submit to regulatory agencies for DOT, City, County, or other required
governing agency permits.
▪ Generate construction prints that clearly communicate the plan of work to the field crews.
6. Produce construction cost estimates (including labor, materials, and vehicle) and obtain/calculate
projected four year revenue as needed. Determine and communicate the need for Contribution-inAid-of-Construction (CIAC) charges to customers based on TEC revenue shortage/excess costs.
7. Access and inspect energized equipment and install current/voltage recording devices for
troubleshooting. Troubleshoot customer voltage complaints using various instruments; such as
recording ammeters, voltmeters. Install, program, and download voltage monitoring devices,
analyze results, and utilize engineering skills and practices to resolve customer voltage complaints.
8. Using visual and physical procedures, investigate, examine, and test the integrity of TEC
distribution facilities to determine the need for replacement or upgrade.
9. Interpret plans for large projects of relative complexity, such as road widening, intersection
improvements, and relocations of infrastructures. Identify all impacted TEC facilities and reconcile
the final design, protecting TEC’s assets and satisfying the local agency requirements. Provide
engineering and project management for large master-planned developments and large commercial
projects including malls, retail, and schools.
10. Support the service area Operations Engineer for reliability issues, customer complaints, fuse sizing
and coordin
What they are looking for
Details
- Work type
- Onsite
- Remote eligible
- No
Get new Engineering internships by email
Free daily digest, matched to what you pick. Unsubscribe anytime.
More Engineering internships
Werkstudent:in PPS Engineer & Künstliche Intelligenz (m/w/d)
Bayer · Leverkusen
Union Operating Engineer Apprentice
JLL · Jersey City, NJ
Structural Engineer Intern
Amentum · Englewood, CO
Praktikum - Entwicklungsbereich Test Engineering (d/m/w)
Vitesco Technologies · Regensburg
Summer 2027 Intern: Architecture/Engineering
Live Oak Banking Company · Wilmington, NC
Associate Customer Quality Engineer Co-op
boseallaboutme · Bloomfield Hills, MI
More at Tecoenergy
Spring 2027 Student Internship - Social Services
Brandon
Spring 2027 Student Internship - Cybersecurity
North Ruskin
Spring 2027 Student Internship- Bayside Operations- Engineer
Tampa, United States
Spring 2027 Student Internship - Strategic Engineering
Tampa, United States
Spring 2027 Student Internship - Proj Mang/Interior Design Facility Svc
Tampa, United States
Spring 2027 Student Internship - Distribution Design and Engineering
Tampa, United States